Transvac- Production Boosting Specialists to the Oil & Gas Industry

Transvac - Production Boosting Specialists

Production Boosting Solutions

Gas Ejector Boosts Production

Gas Ejector Boosts Production by 15% using Waste Energy!
find out more...

Production Boosting

Gas Ejector boosts LP gas well production & reduces condensate loading
find out more...

Ejector Re-starts ‘Dead’ Gas Wells

Transvac patented Ejector re-start gas wells that had been ‘shut-in’ for over 2 years and generates extra production.
find out more...

Gas Ejector

Gas Ejector restarts shut-in LP wells
find out more...

Flare Gas Recovery Ejector Stops Emissions

Transvac Flare Gas Ejector system recovers waste and surplus gas to eliminate emissions to atmosphere.
find out more...

Solids Handling

Eductors for pumping / washing / dumping sand slurry on solid separation systems
find out more...

Ejector Re-starts ‘Dead’ Gas Wells

Transvac patented Ejector re-start gas wells that had been ‘shut-in’ for over 2 years and generates extra production


Operator : NAM Holland

Problem

To restart production of the existing low pressure wells L2-FA that have been shut-in for 2 years due to too high backpressure on the Nogat pipeline.

Transvac Ejector for Restarting Dead Gas Well
Transvac Ejector for Restarting Dead Gas Well

Solution

A patented Universal design Gas Ejector utilised high pressure gas from a new HP well from the L2-FB reservoir to power the Ejector to draw-in and restart the L2-FA wells and thereby boost production.

The Ejector was rated for 630 barg design pressure.

Transvac Gas Production Boosting Flow Diagram
 

Benefits

  • Extra 0.9 MMscmd of gas produced from shut-in L2-FA wells

  • New Ejector internals fitted as well pressures decline to maximise production. New internals have been fitted in less than one shift.

  • Recent new Ejector internals increased production of L02FA-104 well by 0.5 MMscmd. Ejector has no running costs as it utilises motive gas energy normally wasted across a choke valve

  • Ejector requires no maintenance and produces no emissions

  • Universal Ejector design allowed manufacture of Ejector internals to be delayed until new HP well was drilled, thereby reducing project risk.

Client Comments

“The eductor is showing excellent performance to date, generating up to 0.9mln Nm3/d of “extra gas” from the shut-in wells with a drawdown of 34bar between suction and discharge. The eductor will pay back for itself in less than a month”

“I had another look at the Eductor on L2 – brilliant technology”

Reaction of NAM operations staff:

“The eductor is working very fine!”. They were all surprised to see the production kicking in so easily.”

 

Send us your requirements using our Gas Ejector (GJE) Product Enquiry Form

Download PDF